Find Schwing 2 Bolts Clamp, Schwing 2 Bolts Coupling, Schwing 2 Bolts Clamp Coupling on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Pump Parts > Schwing Concrete Pump Parts 2 Bolts Clamp Coupling

Schwing Concrete Pump Parts 2 Bolts Clamp Coupling

  • Schwing Concrete Pump Parts 2 Bolts Clamp Coupling
  • Schwing Concrete Pump Parts 2 Bolts Clamp Coupling

Schwing Concrete Pump Parts 2 Bolts Clamp Coupling

    Payment Type: L/C,T/T,Paypal,Western Union
    Terms of Trade: FOB,CIF
    Min. Order: 1 Piece/Pieces
    Delivery Time: 10 Days
    Packaging: Plastic , Carton , Wooden Packaging
    Productivity: 40 Pcs/Day
    Brand: HBYM GROUP
    Transportation: Ocean,Land,Air
    Place of Origin: Hebei China
    Supply Ability: 40 Pcs/Day
    Port: Tianjin Port,Qingdao Port,Shanghai Port

Basic Info

Model No.: 2 Bolts

Product Description

Schwing Concrete Pump Parts 2 Bolts Clamp Coupling

Schwing Concrete Pump Parts 2 Bolts Clamp Coupling is the usual clamp used in schwing pipeline.

The types of schwing clamp are forged and casting.The schwing 2 bolts clamp coupling is important in all

schwing spare parts.

Besides we could also produce and supply schwing wedge clamp ,wear spectacle plate , concrete pump delivery

cylinder , s valve , piston ram and seal kits for schwing concrete pump truck pump boom pump.


Concrete Pump Parts Products Specification

Product Name Schwing Concrete Pump Spare Parts 2 Bolts Clamp Coupling
Type 2 Bolts
Material High Quality Steel
Color Any Color
Technology Available German Technilogy
Package Plastic+ Carton Box Packaging
Application Schwing Concrete Pump Spare Parts


Concrete Pump Parts Products Photos


Schwing Concrete Pump Parts 2 Bolts Clamp Coupling:

Schwing Clamp 2



Package for Schwing Clamp:

1.Package for Schwing Spare Parts: Standard Plastic + Carton Box Packaging;(As Customer Inquiry)

2.Delivery Time: 7~12 Days after received your advanced payment;(we have enough products in stock)

Package 2018.6.3 d


Concrete Pump Parts Company Introduction

Factory

10 years experience,HBYM GROUP LIMITED is a manufacture trading company.

We are located in Hebei province. Our main business include concrete pump spare

parts, concrete pipe, concrete elbow and clamp. We supply spare parts for Putzmeister

Pump, Schwing Pump, Zoomlion Pump, CIFA Pump, Kyokuto Pump etc. Besides we

could also produce parts as customers` drawing.

We have professional working team, business team, technical team, service team.Our

annual sales about USD 5million.Our business market mainly in North America, Eastern

Europe, Africa, Mid East, Western Europe and Domestic Market.



20170412 103714 Factory 1


Advantage :

1.Professional Quality Checking Team, 100% checking before selling;

2.24 hours online service;

3.A large number products in stock,the most short time for preparing products.


Concrete Pump Parts Exbihition


concrete-pump-part_32

business card

HBYM GROUP Co,.LTD

 HBYM GROUP Co,.LTD was established in 1998 as a professional manufacturer. Our company can supply Pump Parts for many brand, including Putzmeister, Schwing, Sany , CIFA, Kyokuto etc . We can supply concrete pump pipe, concrete pump rubber hose, concrete pump elbow, concrete pump clamp,concrete pump wear plate and cutting ring, concrete pump conveying cylinder.We are famous for high efficiency, reliable quality and prompt delivery. We can supply OEM service for concrete pump manufacture. our team got rich experience in concrete pump industry. We built trustworthy relationship with our customers and look forward to new partners. Market Distribution: America, South Korea, Vietnam, Russia, Middle East etc Service concepts: High efficiency, reliable quality , timely delivery Location: Cangzhou City ,Hebei Province,China(near Tianjin Port and Beijing)

Company Info

  • Company Name: HBYM GROUP Co,.LTD
  • Representative: jianwei wang
  • Product/Service: Concrete Pump Parts , Concrete Pump Pipe , Concrete Pump Elbow , Concrete Pump Rubber Hose , Concrete Pump Wear Plate , Second Concrete Pumps
  • Capital (Million US $): 1000000RMB
  • Year Established: 1998
  • Total Annual Sales Volume (Million US $): US$2.5 Million - US$5 Million
  • Export Percentage: 61% - 70%
  • Total Annual Purchase Volume (Million US $): US$2.5 Million - US$5 Million
  • No. of Production Lines: 6
  • No. of R&D Staff: 5 -10 People
  • No. of QC Staff: 5 -10 People
  • OEM Services Provided: yes
  • Factory Size (Sq.meters): 3,000-5,000 square meters
  • Factory Location: Yanshan county Cangzhou city Hebei province
  • Contact Person: Ms. Anna Guo
  • Tel: 0086-317-5505135
Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters